Irrigation and Drainage Network of Bilevar Field -Kamyaran

Including :Implementing and construction of irrigation and drainage network of B3,B4 zones- developing area of BILEVAR field.This project was located between Kermanshah and Kordistan Provinces and was 70 Km far from Kermanshah city-west of the Kamyaran city Overall description:

1- Main canal 20Km

2- Rock drainage 30Km

3- Cement piping 13Km

4- technical buildings of canal& drainage & pipes

This project contains several parts : Construction of the main canal and siphons that passed rivers and roads- Pipelining- Installing valves-Implementing basins and construction of drainages and structures related to it.

Major operation activities are :

Excavation-in rock &soil 526,780 Cub.m
Excavation-Canal 204,033 Cub.m
Embankment 479,742 Cub.m
Rock fills and Masonary Walls 50,566 Sq.m
Form  Work 44,654 Sq.m
Bar  Work 1,040 Ton
Concrete work 20,657 Cub.m
Construction of Administrative & Residential & Back up bld 1,200 Sq.m