Including :procurement of all construction equipment and construction , installing,Analayzing
and Implement of the Gheshlagh payab main conveyance canal and making of hydro
mechanical equipment related to flow control system and training the operation personnel
and procurement of the As-Built drawings and preparing and maintenance and operation
instruction
Major operation activities are :
Excavation-in rock &soil | 97,840 Cub.m |
Excavation-Canal | 37,368 Cub.m |
Form Work | 72,469 Sq.m |
Bar Work | 1,065Ton |
Concrete work | 17,676 Cub.m |
Construction of Administrative & Residential & Back up | 728 Sq.m |