Water Conveyance Canal from Simindasht to Garmsar-from km 13+646 to km 20+420

Including :Construction of the canal (ave. length :6774 meter ) , Angled drops (30 no. ), Concrete culverts (10 no.) ,Overpass bridges in form of aquaduct (ave . Length : 50 meter) ,Containing Wall (ave. length : 3750 meter), Concrete Siphone (ave . Length : 250 meter ),Covered concrete box (ave. length 400 meter )and intake structures( 4 no.)

Major  operation  activities  are :

Excavation-in rock &soil 770,362 Cub.m
Excavation-Canal 13,028 Cub.m
Embankment 621,537 Cub.m
Rock fills and Masonary Walls 24,300 Cub.m
Form Work 56,311 Sq.m
Bar Work 905 Ton
Concrete work 28,552 Cub.m
Construction of Administrative & Residential & Back up bld 520 Sq.m