Including :Construction of the canal (ave. length :6774 meter ) , Angled drops (30 no. ), Concrete culverts (10 no.) ,Overpass bridges in form of aquaduct (ave . Length : 50 meter) ,Containing Wall (ave. length : 3750 meter), Concrete Siphone (ave . Length : 250 meter ),Covered concrete box (ave. length 400 meter )and intake structures( 4 no.)
Major operation activities are :
| Excavation-in rock &soil | 770,362 Cub.m |
| Excavation-Canal | 13,028 Cub.m |
| Embankment | 621,537 Cub.m |
| Rock fills and Masonary Walls | 24,300 Cub.m |
| Form Work | 56,311 Sq.m |
| Bar Work | 905 Ton |
| Concrete work | 28,552 Cub.m |
| Construction of Administrative & Residential & Back up bld | 520 Sq.m |