Lot 5 and Lot 6 of Tizh Tizh - Garan Road and Baghan Tunnel Project is located in Kurdistan province. The project includes the construction of approximately 10 km paved road and 1,886m tunnel. The project consists of following lots:
1 - Km: 37+500 - 39+508
Construction of paved road with the total length of 2000 m which consists of two 3.65 m lanes, plus two 1.55 m paved shoulders and two 0.3 m unpaved shoulders.
2 - Km: 39+508 - 41+393
Construction of an approximately 1,886m tunnel, which includes two 4.65 m lanes plus two 0.6m sidewalk at the sides.
3 - Km: 41+393 - 42+200
Construction of paved road with the total length of 807 m , which consists of three 3.65-m lanes, plus two 1.55 m paved shoulders and two 0.3 m unpaved shoulders.
4 - Km: 42+200- 42+280
Construction of paved road with the total length of 80 m , which consists of three 3.65-m lanes, plus two 1.35 m paved shoulders and two 1.5 and 0.5 m unpaved shoulders.
5 - Km: 42+280- 43+702
Construction of paved road with the total length of 1422 m , which consists of three 3.65-m lanes, plus two 1.35 m paved shoulders and two 0.5 m unpaved shoulders.
6 - Km: 43+702- 49+300
Construction of paved road with the total length of 5598 m , which consists of two 3.65-m lanes, plus two 1.35 m paved shoulders and two 0.5 m unpaved shoulders.
Major operation activities are :
Excavation | 1,371,020 Cub.m |
Tunnel Excavation | 163,125 Cub.m |
Embankment | 588,320 Cub.m |
Form work | 84,110 Sq.m |
Concrete work | 9,435 Cub.m |
Tunnel Lining | 16,410 Cub.m |
Foundation digging | 10,570 Cub.m |
Steel Frame for Tunnel | 714 Ton |
Mesh work in Tunnel | 245 Ton |
Bar work | 1,235 Ton |
Base Course | 59,965 Cub.m |
Prime coat | 147,435 Kg |
Tack coat | 131,700 Kg |
Asphalt | 1,913,955 Sq.m / cm |