Lot 5 and Lot 6 of Tizh Tizh - Garan Road and Baghan Tunnel (Marivan)

Lot 5 and Lot 6 of Tizh Tizh - Garan Road and Baghan Tunnel Project is located in Kurdistan province. The project includes the construction of approximately 10 km paved road and 1,886m tunnel. The project consists of following lots:

1 - Km: 37+500 - 39+508

Construction of paved road with the total length of 2000 m which consists of two 3.65 m lanes, plus two 1.55 m paved shoulders and two 0.3 m unpaved shoulders.

2 - Km: 39+508 - 41+393

  Construction of an approximately 1,886m tunnel, which includes two 4.65 m lanes plus two 0.6m sidewalk at the sides.

3 - Km: 41+393 - 42+200

Construction of paved road with the total length of 807 m , which consists of three 3.65-m lanes, plus two 1.55 m paved shoulders and two 0.3 m unpaved shoulders.

4 - Km: 42+200- 42+280

Construction of paved road with the total length of 80 m , which consists of three 3.65-m lanes, plus two 1.35 m paved shoulders and two 1.5 and 0.5 m unpaved shoulders.

5 - Km: 42+280- 43+702

Construction of paved road with the total length of 1422 m , which consists of three 3.65-m lanes, plus two 1.35 m paved shoulders and two 0.5 m unpaved shoulders.

6 - Km: 43+702- 49+300

Construction of paved road with the total length of 5598 m , which consists of two 3.65-m lanes, plus two 1.35 m paved shoulders and two 0.5 m unpaved shoulders.

Major  operation  activities  are :

Excavation 1,371,020 Cub.m
Tunnel Excavation 163,125 Cub.m
Embankment 588,320 Cub.m
Form work 84,110 Sq.m
Concrete work 9,435 Cub.m
Tunnel Lining 16,410 Cub.m
Foundation digging 10,570 Cub.m
Steel Frame for Tunnel 714 Ton
Mesh work in Tunnel 245 Ton
Bar work 1,235 Ton
Base Course 59,965 Cub.m
Prime coat 147,435 Kg
Tack coat  131,700 Kg
Asphalt 1,913,955 Sq.m / cm