Including : 119 concrete piles excavation(Dia. : 1 meter ave. depth : 27 meter) in order to
support the temporary steel deck . Construction and installation of 55 steel deck ( ave. length : 20 meter - ave. width : 2.5 meter - ave. weight : 20 ton )
Construction and installation of concrete piles struts in 4 levels (ave. weight : 800 ton) - Excavation under the installed steel deck.
Major operation activities are :
Excavation-open area | 12,000Cub.m |
Excavation-closed area | 35,000 Cub.m |
Pile excavation | 4,000 M.L |
Bar Work | 380Ton |
Concrete work | 6,320 Cub.m |
Heavy Steel Work | 1,500 Ton |
Asphalt | 15,092Sq.m |